point sewer pump station

service structure for Durban's sewer pump designed as a public feature

    2003-2004 complete
    client eThekwini Municipality
    location Point Precinct - Durban, Kwa-Zulu Natal
    durban harbour tunnel north and south top structures

    service structure for Durban's harbour tunnel designed as an urban scuplture and orientation device

      2005-2007 complete
      client eThekwini Municipality
      location Point Precinct - Durban, Kwa-Zulu Natal

      urban sensitivity
      The location of the top structure at the end of Point Road has been determined by the tunnel layout below and will serve as a significant urban device, adding value to the Durban Point Development Framework Plan.

      architectural sensitivity
      The structure forms a seamless capsule allowing workers and vehicles 24-hour access within a safe environment to service the tunnel below.

      While responsive to the industrial harbour context, the sculptural plastic roof form serves as a recognisable landmark along Point Road.

      All stone has been reconstituted from waste collected from various local stonemasons. The stone matches that of the local grey dolerite, which served historically as a significant building material, to the Durban Harbour walls.